2015 |
---|
EN/AS 9100 Certification for the aerospace industry |
2014 |
---|
Second selective soldering system EBSO 350. Power supply tester Siprel ATR-15 |
2013 |
---|
Series production for assemblies AIRBUS A320, Teradyne with VXI extensions for avionics. First selective soldering system EBSO 250, expansion of test and inspection area |
2012 |
---|
Commissioning of a high-precision SMD placement machine MIMOT MX and an EKRA solder paste printer with optical inspection. Expansion of the soldering technology with an IBL SLC304 vapour phase soldering system |
2011 |
---|
Certification DIN EN ISO 13485:2010 and medical devices MPG |
2009 |
---|
Change of name to BESTec-etp Freiburg GmbH, GGF Detlef Burger. Relocation of the administration to Riegeler Straße 4a. Recertification DIN-EN ISO 9001:2008 Production of electronic assemblies and devices |
2007 |
---|
Extension of the SMD assembly by a MIMOT Advantage |
2006 |
---|
Integration of an automatic optical inspection device (AOI) |
2005 |
---|
Expansion of production to RoHS-compliant manufacturing. Introduction of a MIMOT MP1260 (6,000 plc/h) for SMD assembly. |
2004 |
---|
Introduction of professional employee development and leadership training in cooperation with KIM Training Consulting |
2003 |
---|
Certification of the quality management system according to ISO 9001. production of first products in the field of medical technology |
2002 |
---|
Second expansion of production, move to Riegeler Strasse with 1,500m2 production area and complete ESD protection flooring |
2001 |
---|
Manufacture of the first aerospace products. Certification as a recognized training company of the IHK |
1998 |
---|
Cable assembly as competence extension |
1996 |
---|
First expansion of the production to 1.500m2 production area, move to Bötzinger Straße. Introduction of SMD assembly in the production with a UNIVERSAL two-head inline system. First production for the aerospace industry. |
1994 |
---|
Assembly and manual equipment: 10,000 mobile chip card readers |
1991 |
---|
organization of production projects |
1987 |
---|
oundation development |